Brazil - Brazzil Mag - Brazilian Oil Multinational Petrobras Building 9 New Platforms in 4 Years
Advertisement
  Wednesday, 02 December 2009 
Main Menu
Home
News
Back Issues
Advertising
Contact Us
Brazil Forum
Magazine
Brazzil Classic
Yellow Pages
Classifieds
Images
BrazzilMag Newsfeed
Custom Search
Amazon Body Care
-------------
Brazil /Organic personal skin care wholesale / Brazil
--------------
Who's Online
We have 133 guests online
Latest News
Statistics
Members: 494
News: 11494
Web Links: 0
User Menu
Your Details
Submit News
Check-In My Items
My Comments
Login Form





Lost Password?
No account yet? Register
Most Read
Related Items
Contribution
Have you got news?

Do you have news, comment or story on Brazil you want to share with Brazzil? Just send it our way to brazzil@brazzil.com.

 
The Latest from Brazzil Magazine
Home
Brazilian Oil Multinational Petrobras Building 9 New Platforms in 4 Years PDF Print E-mail
Written by Nielmar de Oliveira   
Tuesday, 06 January 2009

Brazilian Petrobras's platform The international financial crisis and the resulting postponing of the disclosure of the Petrobras Business Plan for the 2009/2013 period are not deterring Brazil's oil and gas multinational.

The state-controlled company will maintain the pace of investment in 2009, by hiring, building and launching production at 20 platforms in the coming years. Of that total, nine platforms should become operational between 2009 and 2013.

When operating at full capacity, the nine units combined will add over 790,000 barrels of oil per day and more than 35 million cubic meters of natural gas a day to the national output.

The first semi-submersible platform entirely built in the country will be the P-51, scheduled to start operating in the next few days. The platform's gas compression and power generation modules were built in the city of Niterói (in the state of Rio de Janeiro) and its hull was also manufactured in Brazil, making the P-51 the first 100% Brazilian platform.

Built at a total cost of approximately US$ 1 billion, the unit left the Bay of Ilha Grande in the end of the first half of December headed towards the field of Marlim Sul, in the Campos Basin, where it will remain anchored at a depth of 1,225 meters, 150 kilometers off the coast.

When operating at full capacity, the P-51 is going to produce up to 180,000 barrels of oil and 6,million cubic meters of gas per day - a peak production rate that should be reached in mid-2010. The platform, built at the Brasfels shipyard, in the city of Angra dos Reis (Rio de Janeiro), had a minimum of 70% of national components, generating more than 4,000 direct and 12,000 indirect jobs.

Scheduled to begin operating in late 2010, the P-56 (another of the units that will start functioning by 2013) will develop the Module 3 of the Marlim Sul field, also located in the north of the state of Rio de Janeiro. A replica of the P-51, the platform will be entirely built in Brazil, with a daily processing capacity of 100,000 barrels of oil and 6 million cubic meters of natural gas.

Alongside the P-52 and the P-51, the P-56 is going to comprise a new family of large-sized semi-submersible platforms. The project demands a minimum of 60% of national components. Its construction should generate approximately 4,800 direct jobs and another 20,000 indirect ones in the country.

It is also under construction at the Brasfels shipyard and at the Novo Rio Port, in Rio de Janeiro. The hull blocks are manufactured at the Nuclep, in the city of Itaguaí.

Still in 2010, Petrobras is going to launch the PMXL-1 platform, the tallest fixed platform ever built in Brazil. It will be 227 meters tall and will be installed at the Field of Mexilhão, in the Santos Basin. Under construction at the Mauá shipyard, in Niterói, the PMXL-1 will have a production capacity of up to 15 million cubic meters of natural gas per day.

A platform is part of the Mexilhão Project, regarded by Petrobras as an important part of the Gas Production Anticipation Plan (Plangás). The Mexilhão Project also comprises a maritime gas pipeline with 145 kilometers of extension and the Monteiro Lobato Gas Treatment Unit (UTGCA) under construction in the city of Caraguatatuba (state of São Paulo).

Another unit to be put into operation by the Petrobras, the P-55, also of the semi-submersible type, is scheduled for inauguration in 2013, in the huge field of Roncador, also in the Campos Basin. According to the Petrobras, the unit will have a daily production capacity of 180,000 barrels of oil and compression capacity for 6 million cubic meters of gas. The construction of this unit should use at least 70% of national material and generate over 3,500 direct jobs in the municipality of Rio Grande alone (state of Rio Grande do Sul).

The Brazilian state-owned oil company also informed that the assembly of the platform should take place at the Naval Hub of Rio Grande and in Niterói. Construction of the hull has already begun at shipyard Atlântico Sul (state of Pernambuco) and will be concluded at the Naval Hub of Rio Grande.

However, prior to that, in 2012, Petrobras will place into operation at the field of Jubarte (in the portion of the Campos Basin located in the state of Espírito Santo) the P-57 platform. With a daily production capacity of 180,000 barrels of oil and 2 million cubic meters of gas, construction of the platform should generate 3,000 jobs in Brazil, with a minimum of 65% of national components.

The hull of the P-57 will be the result of the conversion of oil tanker Island Accord into a FPSO (Floating Production, Storage and Offloading) platform.

The conversion work began at shipyard Keppel, in Singapore, and the deadline for conclusion is December 2009. In the first week of February 2010, the hull should arrive at the Brasfels shipyard, in Angra dos Reis, where the modules (being manufactured in Brazil) will be installed and integrated to the platform.

In turn, the P-59 and P-60 platforms, to be constructed in the municipality of São Roque do Paraguaçu, in Maragogipe (state of Bahia), will be of the self-elevating drilling variety. According to the state-owned company, this model of platform, capable of drilling under conditions of high pressure and high temperature, had not been built in Brazil for approximately 30 years.

Minimum national content is 70%, and construction work is expected to generate around 2,500 direct jobs. Construction of the P-59 and P-60 should take 1,200 and 1,320 days, respectively. The work should begin in 2009 and continue until 2012.

According to Petrobras, platforms P-61 and P-63 will be located in the field of Papa-Terra, in the Campos Basin, approximately 111 kilometers off the coast of the municipality of Cabo Frio, in the state of Rio de Janeiro. Petrobras operates the field in partnership with the Chevron company.

The P-61 platform will be the first of the Tension Leg Wellhead Platform (TLWP) built in Brazil. Installed at a depth of 1,180 meters, the enterprise will be responsible for the drilling of 21 wells (18 producer wells and three reserve ones) and the pumping of production to the P-63, in which the oil will be processed. This model of platform was chosen due to the characteristic of the oil produced in the field of Papa-Terra, which is of the ultra-heavy variety (14.2° API).

The P-63 will be of the FPSO type. It should have daily processing capacity for producing 150,000 barrels and daily compressing capacity for 1 million cubic meters of gas. Besides the oil coming from the P-61, the platform is also going to process the production of three wells linked to the unit. Minimum national content will be 65% and the contract should be signed in the first half of 2009. Production should begin in the first quarter of 2013.

ABr

Hits: 3427
Comments (3)Add Comment
the Petrobras Business Plan for the 2009/2013 period are not deterring Brazil's oil and gas multinational.
written by ch.c., January 06, 2009
Sure !
As long as Petrobras gets US$ 80.- per barrel...or well above the current price everything looks promising !

Thank you Brazilians consumers ! More oil will flow around the World.
No one knows at what price, except Brazilians.... as long as oil is below US$ 80.-
Very competitive transportations costs of goods knowing the large distances of your country !
But dont worry...if oil will rise above US$ 80.- then you the consumers will get the benefits.
report abuse
vote down
vote up
Votes: +0
job gerals
written by silvia de cordova, May 26, 2009
i need job...
report abuse
vote down
vote up
Votes: +0
...
written by silvia de cordova, May 26, 2009
am silvia from brazil and live in uk....speak spanish and portuguese fluent and basic english need very much job
report abuse
vote down
vote up
Votes: +1

Write comment
quote
bold
italicize
underline
strike
url
image
quote
quote
smile
wink
laugh
grin
angry
sad
shocked
cool
tongue
kiss
cry
smaller | bigger

security code
Write the displayed characters


busy




Reddit!Del.icio.us!Facebook!Slashdot!Netscape!Technorati!StumbleUpon!Newsvine!Furl!Yahoo!Ma.gnolia!Add this social bookmarking functionality to your website! title=
 
< Prev   Next >
Brazzil Magazine on Twitter


Visit Brazzil Social with Video, Music and Chat


Home
Brazzil Magazine - Since 1989 trying to understand Brazil
  • Brazil Engaged in Another Olympics: Reshaping Its Image Before Games Open


    Economist's cover on BrazilBrazil received a huge boost in its international image with its selection as the host of the 2016 Olympics, but it was really just the cherry on top of the overall recognition of the country's ascension to the ranks of one of the world's most important countries. Now, as it finally takes its place on the world scene, there has been a great deal of concern about what kind of image Brazil hopes to project, now that the world is really paying attention.

  • Iranian Leader's Visit to Brazil Takes the Gloss off Lula's International Image


    Ahmadinejad meets LulaThe only good thing to say about the visit to Brazil of Iran's president, Mahmoud Ahmadinejad, on Monday November 23, is that it was mercifully short and lasted less than 24 hours. Ahmadinejad had his picture taken being hugged by president Luiz Inácio Lula da Silva who gave him a warm welcome and said Iran had every right to develop nuclear energy for peaceful purposes.

  • Poor Women from Northeast Brazil Learn Joy of Meeting and Helping Each Other


    Joined hands The small, coastal town of Condé is located just a twenty minute's drive from João Pessoa, the capital of Paraíba. The Northeast of Brazil has historically been a place of encounter and mixing between peoples. For millenia groups of indigenous people fished, farmed, migrated and sometimes fought along this large, fertile area.

  • Ahmadinejad's Visit: Iran, Honduras and Brazil's Hypocrisy in Dealing With Them


    Ahmadinejad and Lula The Brazilian diplo-MÁ-cia (bad diplomacy) carries on its accelerated course towards the non-acknowledgment of human rights, although sometimes it takes pleasure in saying that it does precisely the opposite. The visit of Iran's president, Mahmoud Ahmadinejad, is another example of a diplomatic omission that verges on hypocrisy.

  • Lula Is About to Fulfill His Wish of Getting His Good Friend Chavez in Mercosur


    Lula and Chavez On July 4, 2006, representatives of Argentina, Brazil, Paraguay and Uruguay met in Caracas to sign the protocol for the entrance of Venezuela into the Southern Common Market (Mercosur). After two and a half years, the protocol was approved by the legislative bodies of Argentina and Uruguay, and as of now it may be only days away from being ratified by the continent's economic megalith, Brazil.

  • Denying Education is the Other AIDS. And Brazil Is Guilty of Inflicting It


    Children from a Diadema band Some sectors of the fight against AIDS have suggested that Thabo Mbeki, the former president of South Africa, committed genocide through his absence from the fight against the illness in his country throughout his two terms.

  • Child Labor Went Down in Brazil, But 5 Million Underage Workers Are Still Way Too Many


    Child labor in Brazil One hundred and eleven years after Brazil abolished slavery, the number of workers deprived of their freedom is still huge. They raise cattle, produce charcoal, sugar cane or timber. Some of them, most undocumented Bolivians, work in basements of small apparel factories in São Paulo and other metropolis.

  • Some Humility Would Do Lula Good. On Human Rights Brazil Has Long Way to Go


    A prison in Rio de Janeiro, Brazil On November 7, 2009 a few friends and I had an opportunity to take a look inside a Brazilian jail outside the city of Rio de Janeiro. We were able to take some amateur footage of our experience on video (see link below). It's no surprise, of course, that the typical Brazilian jail lacks some of the functionality of those in North America or Europe, but our experience that day was quite shocking.

  • Brazil's Amazon Rainforest Policy Is a One-Way Road to Disaster


    Trasamazonian road in BrazilDepletion of the Amazon Rainforest is not a new concern facing environmentalists, biologists, ecologists, and a growing number of the Amazonian indigenous peoples. For decades they have feared for the fate of the world's most biologically diverse and species-rich hothouse.

  • Geisy, Brazil's Miniskirt Student, Should Try US College Next Year


    Geisy Arruda from BrazilGeisy Arruda made history this week in Brazil, but for all the wrong reasons. What began as a poorly planned fashion statement has become a worldwide tale. Geisy decided to wear a pink mini-dress to her private college in São Paulo state, and after that, all hell broke loose.